수출 규정 준수| GCC · MEA · APAC| 비즈니스 베이, 두바이, UAE

엔터프라이즈 솔루션

AI Data Centers

Facilities engineered for high-density GPU infrastructure — power, liquid cooling, and structural capacity.

Liquid coolingHigh densityPower planning

Facilities that can actually host modern GPUs

A 8×B200 node draws more power than an entire legacy rack. We plan the facility side so the hardware is not throttled the day it arrives.

  • Rack density planning (40 kW → 130 kW+ per rack)
  • Direct-to-chip liquid cooling and rear-door heat exchangers
  • Power distribution, redundancy topology (N+1, 2N), and UPS sizing
  • Gulf-climate specific thermal design and free-cooling limits

자주 묻는 질문

What AI infrastructure solutions do you provide?
We provide enterprise AI infrastructure solutions including GPU servers, AI clusters, high-performance computing (HPC), AI storage, networking, data center design, deployment, and consulting services.
Which industries do you serve?
We serve healthcare, banking, government, education, manufacturing, oil and gas, telecommunications, retail, logistics, hospitality, research institutions, and enterprise organizations.
Can you design complete AI infrastructure for enterprise workloads?
Yes. We provide end-to-end AI infrastructure planning, including GPU compute, storage, networking, rack design, power planning, cooling considerations, deployment, and ongoing support.
Do you provide GPU servers for AI model training and inference?
Yes. We offer enterprise GPU server solutions designed for AI model training, inference, machine learning, deep learning, scientific computing, and other high-performance workloads.
What lead times should I expect for GPU servers?
Lead times vary by architecture. H100/H200 typically ship in 2–4 weeks, Blackwell B200/B300 in 6–10 weeks, and L40S/L4 in 1–3 weeks. Contact us for current availability.

시작할 준비가 되셨나요?

AI 인프라를 구축하세요 확신을 가지고

엔터프라이즈 인프라 팀과 상담하세요. 전문가의 조언, GPU 가격, 맞춤형 배포 계획을 받아보세요 — 별도의 약정은 필요 없습니다.

실시간 채팅 엔터프라이즈 인프라 팀
eCirclec